Specializing in
Bidding and bid disputes
Contract negotiation, review and drafting
Performance issues
Claims
Dispute resolution, including administrative remedies, arbitration, mediation and litigation
Surety issues
Representative Matters
Public Works and Construction
Dams/Major Water Projects
Chief Joseph Dam, Bridgeport, Washington - Disputes regarding the raising of a principal Corps of Engineers dam and power facility on the Columbia River with special emphasis on the excavation protocol and blasting techniques used during demolition phase of reconstruction. 
Merrill Creek Dam, New Jersey - Representing utility consortium, owner of earth and rock dam and pumped storage facility in disputes involving geological investigations, core processing and borrow requirements. 
Mactaquac Hydro Power Project, Province of New Brunswick, Canada - Representing owner of major dam facility serving Canada and Eastern United States in disputes involving soil compaction and earth moving procedures. 
Guri Dam, Caroni River, Venezuela - Major South American hydro project; local and World Bank disputes procedures involving concrete dam, including spillway gate, concrete mix design and tailrace problems. 
Lock & Dam 8, Conway, Arkansas - Major facility on Corps of Engineers Arkansas River program; advice on numerous change orders regarding "dental" excavation, concrete placement.
Cypress Creek Wellfields, Florida - Representation of contractor on defense of owner claims against engineer, contractor and pipe manufacturer arising out of post-construction rupture of portion of 37- mile 84" reinforced concrete water pipe feeding Pinellas and Pasco (Fla.) counties.
West Point Dam, West Point, Georgia - claims arising during construction of Corps of Engineers project alleging improper compaction of 125,000 c.y. clay core section of earth and rock dam. 
Fishtrap Reservoir and Inlet Structure, Pikeville, Kentucky - Disputes with United States Corps of Engineers over hydrological and hydraulic design features for inlet structure at Fishtrap Reservoir.
Felsenthal Lock and Dam, Huttig, Arkansas - Major problems with dewatering design embankment procedures and on feasibility of construction of principal structures on the United States Army Corps of Engineers Ouachita-Arkansas River navigation system.
Ocoee #2 Hydroelectric Plant and Flume, Ocoee, Tennessee - Reconstruction of five-mile wooden flume for TVA hydroelectric project, including problems with access, wood treatment and installation of planking used in flume and concrete grade beams.
Wallace Dam, Eatonton, GA - Major dam and power project for Georgia Power Company; disputes over earth embankment and electrical design and installation.
Little Seneca Lake, Seneca, Maryland - Represented contractor on claims arising from the construction of an earthen dam and intake structure, including problems with spillway, intake structure and outflow.
Kremasta Dam and Hydroelectric Project, Acheloos River, Greece - Represented contractor on various claims arising from construction of largest earth dam in Europe, including excavation, cofferdam collapse, spiral ring, turbine and diversion tunnel controversies. 
Round Valley Reservoir (NJ) - Represent general contractor against claims of owner following rupture of 120" PCCP release line from dam.